1. INTRODUCTION
Reference is made to the Company's announcements dated 17 August 2026, 28 August 2026 and 4 September 2026 (collectively, "the Previous Announcements") in relation to the above suit ("the Suit"). Unless otherwise defined, the terms used in this announcement have the same meanings as those defined in the Previous Announcements.
The Board of Directors of AuMAS ("the Board") wishes to announce that, on 21 October 2026, the High Court of Sabah and Sarawak at Tawau ("the Court") heard both parties on Southsea Gold Sdn. Bhd.'s ("SGSB") application for an interim injunction (Enclosure 3). The Court then granted an interim prohibitory injunction against Wullersdorf Resources Sdn. Bhd. ("WRSB"), a wholly-owned subsidiary of AuMAS ("the Order"). WRSB's solicitors received the sealed Order on 5 November 2026.
2. TERMS OF THE ORDER
The Order restrains WRSB, whether acting by itself or through its directors, officers, employees, contractors or agents, until the final disposal of the Suit or further order of the Court, from causing, permitting or allowing untreated acidic or otherwise contaminated water, tailings effluent or process waste from the Tailings Storage Facility at Bukit Mantri, Tawau ("TSF") to escape from its operating containment, collection, treatment and return system and to enter:
(a) any part of Country Lease No. CL 105681141 outside the area in which that system operates; or
(b) any river channel or watercourse connected with that land.
The Order also provides that:
(i) the restriction applies only to an escape or discharge that WRSB can reasonably prevent or control, and seepage entering a functioning toe drain or treatment pond for collection and recirculation is not, by itself, a breach of the Order;
(ii) WRSB may carry out inspection, sampling, monitoring, emergency containment, pumping within the water-management system, treatment, neutralisation, repair, redesign or remediation, provided these comply with the directions of the relevant authorities;
(iii) the Order does not, by itself, prohibit WRSB's ordinary mining or processing operations, and does not impose a complete ban on placing additional material in the TSF;
(iv) WRSB remains bound to comply with all applicable regulatory directions, including the determination of the Chief Inspector of Mines dated 2 September 2026;
(v) the Order does not change, suspend or permit a breach of the injunction orders dated 4 December 2023 and 6 November 2025 in the earlier suits between the parties, and SGSB, whether by itself or through its directors, officers, agents or others, must not obstruct WRSB's lawful access or its genuine inspection, containment, repair and remediation activities protected by those orders;
(vi) the ad interim order dated 3 September 2026, announced by the Company on 4 September 2026, ceases to have effect upon formal entry of the Order and is replaced by the Order; and
(vii) costs of the application are costs in the cause.
3. COMPARISON WITH THE AD INTERIM ORDER
The Order was made after the Court heard both parties and considered the affidavits filed by WRSB. Compared with the ad interim order dated 3 September 2026, the Order:
(a) limits the restriction to escapes or discharges that WRSB can reasonably prevent or control;
(b) expressly provides that seepage entering a functioning toe drain or treatment pond for collection and recirculation is not, by itself, a breach;
(c) expressly provides that it does not prohibit WRSB's ordinary mining or processing operations, or impose a complete ban on placing additional material in the TSF;
(d) expressly permits WRSB to carry out inspection, monitoring, containment, treatment, repair and remediation works at the TSF; and
(e) expressly requires SGSB, and those acting for it, not to obstruct WRSB's lawful access or its inspection, containment, repair and remediation activities.
4. FINANCIAL AND OPERATIONAL IMPACT
The Order expressly preserves WRSB's ordinary mining and processing operations and its ability to carry out containment and remediation works at the TSF. No costs have been ordered against WRSB, and the costs of the application are costs in the cause. The Board does not expect the Order to have any material financial or operational impact on the AuMAS Group.
5. STATUS OF THE SUIT
The Suit next trial date is fixed on 23 February 2027 to 26 February 2027. WRSB will continue to defend the Suit and to comply with the Order and all applicable regulatory directions.
The Company will make further announcements on any material development in the Suit.
This announcement is dated 6 November 2026.