Albert Heng

  • Following

    0

  • Followers

    6


Fame: 62
Joined Oct 2025

Comments

https://youtu.be/wlddLTF0gOw?si=BSPZac-vNtT-29oZ
WILL COMPLETED ON END OF OCT 2026
2 weeks · translate
Source from MAA car selling
2019.571 632 unit
2022.702 275 unit
2025.820 753 unit
3 weeks · translate
相当保守估计,2030后或更早,股价也会到rm1.00++..股价每年会涨十巴仙至2030年,以昨天收市价rm0.70 为准。好过放定期。有耐心加时间者将会成为最终的盈者
3 weeks · translate
一个在岸上钓鱼的人永远会胜过跳进河水捉鱼的人。信不信由你们
3 weeks · translate
Silk highway 37km , tol rm1.80 . Tol collection 35M..
4 weeks · translate
Clearly stated in qtr , the highway will 100% complete march 2027
4 weeks · translate
Refer back 2019 , tol collection only section 5 n 8, rm13 M, section 3 n 4 min should have rm15. Amplified factor n section 7 not count in.
But if refer to Prolintas with 73km ( about same lengths with wce selanggor section) , tol collection steady at rm85 M
4 weeks · translate
乌鸦多的地方必会很多死尸
4 weeks · translate
bad qtr report but have good future
4 weeks · translate
Load more