Our website is made possible by displaying non-intrusive online advertisements to our visitors.
Please consider supporting us by disabling or pausing your ad blocker.
Hui, I’m not sure if outsourcing will work as Aemulus owns the design and the patent for ATE. If there are any SEMCO orders the total volume would be significant, even if the orders are split into smaller batches and released batch by batch.
Aemulus has significantly increased its hiring over the past couple of months. This hiring spree coincides with a surge in book orders. At the current level, if the secured orders are as expected stand at 114 millions, the existing production floor should still be able to cope with demand. The 2026 and 2027 are expected to be the busiest years for Aemulus in terms of order deliveries. The key question is whether, if additional orders such as those from SEMCO are secured, Aemulus will still be in a good position to meet delivery schedules on time?